PUR/APF/2019-20/IND13207 |
Supply and Installation of "Flow Cytometer with Sorter: Qty - 1 No. and Analytical Flow Cytometer (FACS - Analyzer): Qty - 1 No." |
26.12.2019 @ 5.30pm | Under process |
PUR/APF/2019-20/IND13090 |
Supply and Installation of the Stereo Zoom Microscope: Qty - 3 Nos. |
10/12/2019 | Under process |
PUR/APF/2019-20/IND13233 |
Supply and Installation of the Refrigerated Table Top Centrifuge: Qty - 2 Nos. |
10/12/2019 | Under process |
PUR/APF/2019-20/IND13129 |
Supply and Installation of the Projector: Qty - 2 Nos. |
10/12/2019 | Under process |
PUR/APF/2019-20/IND13008 |
Supply and Installation of the Nucleic Acid Sample Processing Platform:: Qty - 1 No. |
10/12/2019 | Under process |
PUR/APF/2019-20/IND13251 |
Supply and Installation of the Long Read Next Generation Sequencer: Qty - 1 No. |
10/12/2019 | Refloated |
PUR/APF/2019-20/IND13038 |
Supply and Installation of the Karyotyping Workstation Station System: Qty - 1 No. |
10/12/2019 | Under process |
PUR/APF/2019-20/IND12957 |
Supply and Installation of the
"High Throughput Electrophoresis Instrumentation: Qty - 1 No. |
10/12/2019 |
refloated |
PUR/APF/2019-20/IND13013 |
Supply and Installation of the "Benchtop Next Generation Sequencing System: Qty - 1 No." |
10/12/2019 | Refloated |
CDFD/PUR/2019-20/IND13186 |
Supply and Installation of the Surface Plasmon Resonance Based Biomolecular Interaction System under Buy Back offer for Biacore 3000: Qty - 1 No. |
21/11/2019 | Refloated |
CDFD/ENGG/HVAC/Works/2019-20/06, Dated 03-10-2019 |
Providing of 2.0 TR Split Air Conditioners in Guest Rooms (Creation of Guest House), Tower AC Units at Stores & Purchase and Radio Active Facility Laboratory and Site 'B', Uppal |
20/11/2019 | Under process |
TENDER NO.CDFD/EST/PCS/2019 |
Pest Control Services contract |
18/11/2019 | M/s PCI Pest Control Pvt. Ltd. |
Tender CDFD/ENGG/Elect/Works/2019-20/04, Dated 20-08-2019 (Re-Tender), |
Providing of Fibre Reinforced Plastic (FRP) for condenser water MS Pipe Line for Central AC Plant at Animal House, Site ‘A’, Uppal, Hyderabad |
6/11/2019 | Under process |
Tender No.CDFD/ENGG/Civil/HORTI/AMC/2019-20/11, dated 18-10-2019 Corrigendum |
Annual Job Contract for Horticulture Maintenance work at CDFD Lab and Hostel cum Residential Complexes, Uppal Campus, Hyderabad |
| Under process |
Tender No. PUR/APF/2019-20/IND12898 Date: 25.09.2019 |
Supply and Installation of the "Refrigerated Table Top Centrifuge: Qty – 3 Nos." |
16.10.2019 | Under process |
Tender No. PUR/APF/2019-20/IND12905 Date: 25.09.2019 |
Supply and Installation of the "Thermo Mixer: Qty – 1 No." |
16.10.2019 | Under process |
Tender No. PUR/APF/2019-20/IND12900 Date: 25.09.2019 |
Supply and Installation of the "PCR Machine: Qty – 3 Nos." |
16.10.2019 | Under process |
Tender No. PUR/APF/2019-20/IND12908 Date: 25.09.2019 |
Supply and Installation of the "Fluorimeter: Qty – 1 No." |
16.10.2019 | Under process |
Tender No. PUR/APF/2019-20/IND12920 Date: 25.09.2019 |
Supply and Installation of the "Single Channel Pipettes: Qty – 36 Nos. and Multi Channel Pipettes: Qty – 4 Nos." |
16.10.2019 | Under process |
Tender No. PUR/APF/2019-20/IND12852 Dated 25.09.2019 |
Supply and Installation of "Refrigerated Incubator: Qty – 1 No." |
16.10.2019 | Under process |
Tender No. PUR/APF/2019-20/IND12592 Dated 24.09.2019 |
Supply and Installation of the "Non-Refrigerated Table Top Centrifuge: Qty – 1 No" |
16.10.2019 | Under process |
Tender No. PUR/EQP/2019-20/IND12903 Date: 25.09.2019 |
Supply and Installation of the “-20°C Freezer: Qty – 4 Nos |
16.10.2019 | Under process |
Re-Tender document No.CDFD/ENGG/Civil/Works/2019-20/06, dated 04-09-2019
|
Annual Maintenance Contract for Disinfection and Cleaning of Underground and Overhead Water tanks at CDFD, Hyderabad”. |
25-09-2019 | Under process |
TENDER Notice NO.CDFD/ENGG/Elect/Works/2019-20/04, Dated 20-08-2019 |
Providing of Fibre Reinforced Plastic (FRP) for condenser water MS Pipe Line for Central AC Plant” at Animal House, Site ‘A’ Uppal, Hyderabad. |
23.09.2019 | Under process |
TENDER NO.CDFD/ADMN/CANT/2018-19 Dated 20.08.2019 |
For providing Canteen Services at CDFD, Uppal, Hyderabad. |
20.09.2019 | Under process |
Notice NO: CDFD/SCRAP/AUGUST/2019 Date: 22.08.2019 |
For Disposal of Un-serviceable / obsolete / scrap materials as per list enclosed. |
03.09.2019 | Under process |
NIT NO: CDFD/ENGG/CIVIL/HORTI/AMC/2019-20/11 Dated 02/08/2019 |
Annual job contract for Horticulture maintenance work at CDFD Lab & Hostel cum Residential Complexes |
23.08.2019 | Under process |
No.CDFD/ENGG/ELECT/BSL-3/HVAC/WORKS/2019-20/05 |
Providing Consultancy Services for BSL-3 Chiller Plant at CDFD Campus, Site ‘A’ Uppal, Hyderabad. |
08.08.2019 | Under process |
NIT NO: CDFD/ENGG/CIVIL/WORKS/2019-20/06) |
Annual Maintenance Contract for Disinfection and Cleaning of Underground and Overhead Water tanks at CDFD, Hyderabad. |
05.08.2019 | Under process |
CDFD/ENGG/civil/works/2019-20/10 dated 15-07-2019 |
Creation of Office Space for NGC Lab using Aluminium Partition at 4-C Lab Area |
05.08.2019 | Under process |
CDFD/ENGG/HVAC/MAINT/TEND/2019-20/01, Dated 05-07-2019 Corrigendum dated. 12.07.2019 New |
Comprehensive Annual Maintenance of Chillers (6 Nos.) and Operating and AMC (Manpower supply) of HVAC Central Plant (Main Laboratory AC Plant, Animal House AC Plant and BSL-3 AC Plant) for the period from 01-08-2019 to 31-07-2020 at CDFD Laboratory Building Site ‘A’, Uppal Campus |
| Under process |
(NIT NO: CDFD/ENGG/CIVIL/WORKS/2019-20/08) |
Interior Woks in VIP Guest House at Site ‘B’ Uppal Campus Hyderabad |
15.07.2019 | Under process |
PUR/COM/2019-20/IND12739 |
supply and installation “Server: Qty – 1 No. and Desktop: Qty – 1" |
23.07.2019 @ 2.30pm | Under process |
PUR/COM/2019-20/IND12640
|
supply and installation of “Desktops: Qty – 6 Nos., Color Laser Printer: Qty – 1 No. and Black & White Printer: Qty – 1 No.” |
23.07.2019 @ 2.30pm | Under process |
CDFD/PUR/2019-20/IND12674
|
12 Volts, 100Ah - 20 HR Panasonic / Exide / Amaron Quanta make SMF BATTERIES FOR 80kVA UPS SYSTEM AND 65Ah - 20HR Panasonic / Exide / Amaron Quanta make SMF BATTERIES FOR 40kVA UPS SYSTEM |
23.07.2019 @ 2.30pm | Under process |
PUR/APF/2019-20/IND12738 Revised on 11.07.2019
|
supply and installation of “Hemoglobin Variant Screening: Qty – 1 No.” |
23.07.2019 @ 2.30pm | Under process |
PUR/EQP/2019-20/IND12643
|
supply and installation of “DLP Laser Projector System: Qty – 1 No |
23.07.2019 @ 2.30pm | Under process |
PUR/EQP/2018-19/IND11873
|
supply and installation of “Audio System: Qty – 1 No.” |
18.06.2019 @ 2.30pm | Under process |
PUR/PRT/AR/2019-20/IND12705
|
for printing and supply of “ANNUAL REPORTS” |
7.06.2019 @ 2.30pm | Under process |
PUR/APF/2019-20/IND12627
|
supply and installation of “CO2 Incubator: Qty – 2 Nos.” |
7.06.2019 @ 2.30pm | Under process |
PUR/APF/2019-20/IND12599
|
supply and installation of “Benchtop UV Transilluminator: Qty – 2 Nos" |
7.06.2019 @ 2.30pm | Under process |
PUR/APF/2018-19/IND12165
|
supply and installation of “Ultra Low Temperature Freezer: Qty – 3 Nos" |
7.06.2019 @ 2.30pm | Under process |
PUR/APF/2018-19/IND12353
|
“For supply and installation of Bath Sonicator: Qty – 1 No." |
21.05.2019 @ 2.30pm | Under process |
PUR/APF/2017-18/IND11347 |
“For supply and installation of Inverted Microscope: Qty – 8 Nos" |
21.05.2019 @ 2.30pm | Under process |
PUR/APF/2018-19/IND12212 |
“For supply and installation of Refrigerated Incubator: Qty – 1 No." |
21.05.2019 @ 2.30pm | Under process |
PUR/APF/2018-19/IND12167 |
“For supply and installation of Shaking Waterbath: Qty – 2 Nos." |
21.05.2019 @ 2.30pm | Under process |
PUR/APF/2018-19/IND11742 |
“For supply and installation of Table Top Refrigerated Clinical Centrifuge: Qty – 1 No." |
21.05.2019 @ 2.30pm | Under process |
PUR/EQP/2018-19/IND11783 |
“For supply and installation of Bacterial Incubator: Qty – 2 Nos." |
21.05.2019 @ 2.30pm | Under process |
PUR/APF/2018-19/IND12377 |
“For supply and installation of "Floor Model Refrigerated Incubator shaker: Qty -1 No ” |
21.05.2019 @ 2.30pm | Under process |
PUR/APF/2018-19/IND12487 |
“For supply and installation of "Liquid Nitrogen Storage Container: Qty 1 No ” |
21.05.2019 @ 2.30pm | Under process |
PUR/APF/2018-19/IND12244 |
“For supply and installation of "Semi – Automatic Microtome: Qty – 1 ” |
21.05.2019 @ 2.30pm | Refloated |
PUR/APF/2018-19/IND12200 |
“For supply and installation of "Table Top Orbital Shaker: Qty – 2 Nos ” |
21.05.2019 @ 2.30pm | Under process |
PUR/EQP/2018-19/IND12378 |
“For supply and installation of “Vertical Laminar Air Flow Hood: Qty –2 No ” |
21.05.2019 @ 2.30pm | Under process |
Tender No. CDFD/ADMN/SEC/2019 |
“Providing Security Watch and Ward Services by Ex-servicemen Security Guards to CDFD” |
13.05.2019 @2.00pm. | Under process |
Tender No.CDFD/ENGG/HVAC/Works/ 2018-19/15 |
“Providing of 2.0 TR Air Conditioners at Laboratory Building and Guest House" |
29-04-2019. |
Under process |
Tender Notice No.: CDFD/ENGG/ELECT/MAINT/TEND/2019-20/01 |
“Maintenance of Electrical Equipments and Installations” for the period from 1st May 2019 to 30th April 2020 |
15-04-2019. |
Under process |
Tender No.CDFD/ENGG/Civil/Works/2018-19/30 |
Creation of Play Ground at CDFD Laboratory Complex Site, Uppal, Hyderabad |
03-04-2019. @ 15:00 |
Under process |
(NIT NO: CDFD/ENGG/CIVIL/WORKS/2018-19/28) |
TENDER FOR CREATION OF GAS BANK, GAS STORAGE, FLOORING IN STORES AREA AND DUMP YARD |
20.03.2019 @ 3:00pm |
Under process |
PUR/APF/2018-19/IND12346 |
Next Generation Massively Parallel Sequencing System”: Qty – 1 No. |
22.02.2019 @ 2.30pm |
Under process |
PUR/APF/2018-19/IND12293 |
Gamma Ray Spectrometer: Qty – 1 No. |
22.02.2019 @ 2.30pm |
Under process |
CDFD/ADMN/SEC/2019 |
For providing Security Watch & Ward Services by Ex-Servicemen Security Guards at CDFD, Uppal, Hyderabad |
18.02.2019 @ 2.00pm |
Under process |
CDFD/PUR/AP28L4575/2019 |
Disposal of the condemned Auto Rickshaw (Three wheeler) on "AS IS WHERE IS" basis. |
24.01.2019 @ 1.00pm |
Under process |
CDFD/ENGG/Elect/Works/2018-19/27 |
Providing of internal Electrification works for Stores and Purchase Section at Cellar, Uppal, Hyderabad |
31.01.2019 @ 3.00 pm |
Under process |
PUR/APF/2018-19/IND12194 | Tissue culture grade DNase, RNase free and Biotechnology grade suitable for Biological Research Purpose Chemicals" |
25.01.2019 @ 2.30pm |
Under process |
PUR/APF/2018-19/IND12246 | supply and installation of “Stand Alone Super Resolution Microscope”: Qty – 1 No.” CDFD Uppal, Hyderabad. |
30.01.2019 @ 2.30pm |
Under process |
PUR/APF/2018-19/IND11880 | supply and installation of “Refrigerated / Cooled Incubator: Qty – 1 No.” CDFD Uppal, Hyderabad. |
25.01.2019 @ 2.30pm |
Under process |
PUR/APF/2018-19/IND11784 | supply and installation of" Refrigerated Table Top High Speed Centrifuge : Qty – 2 Nos.” CDFD Uppal, Hyderabad. |
25.01.2019 @ 2.30pm |
Under process |
PUR/APF/2018-19/IND12165 | supply and installation of " Ultra Low Temperature Freezer: Qty – 1 No.”, CDFD Uppal, Hyderabad. |
25.01.2019 @ 2.30pm |
Under process |
PUR/APF/2018-19/IND12200 | supply and installation of “Orbital Shaker: Qty – 2 Nos.”, CDFD Uppal, Hyderabad. |
25.01.2019 @ 2.30pm |
Under process |
PUR/APF/2018-19/IND12212 | supply and installation of "Refrigerated Incubator: Qty – 1 No.”, CDFD Uppal, Hyderabad. |
25.01.2019 @ 2.30pm |
Under process |
PUR/APF/2018-19/IND12167 | supply and installation of “Shaking Waterbath: Qty – 1 No.”, CDFD Uppal, Hyderabad. |
25.01.2019 @ 2.30pm |
Under process |
PUR/APF/2018-19/IND12205 |
supply and installation of “Ultrasonic Probe Sonicator: Qty – 1, CDFD Uppal, Hyderabad. |
25.01.2019 @ 2.30pm |
Under process |
CDFD/PUR/CANT/2018-19 |
For providing Canteen Services at CDFD, Uppal, Hyderabad. |
10.01.2019 @ 5.00 pm |
Under process |
PUR/APF/2017-18/IND11347 |
supply and installation of "Inverted Microscope: Qty - 8 Nos. |
10.12.2018 @ 5.00pm |
Under process |
PUR/APF/2018-19/IND12013 |
Supply and installation of Chemiluminesence System: Qty - 2Nos. |
10.12.2018 @ 5.00pm |
M/s. GE Healthcare Pte Ltd |
CDFD/ENGG/Elect/Works/2018-19/26 |
Providing MS welded mesh on compound wall of 33kV sub-station with MS arrows for safety of sub-station at site 'A', Uppal campus, Hyderabad |
30.10.2018 @ 3:00 pm |
Under process |
CDFD/ENGG/Elect/Works/2018-19/24 |
Providing internal Electrification works (4th Floor 'C' Wing) for CDFD campus at Site 'A' Uppal, Hyderabad |
24.10.2018 @ 3.00pm |
Under process |
PUR/EQP/2018-19/IND11954 |
Water Cooler with inbuilt UV 120 ltrs |
24.10.2018 @ 5.00pm |
Under process |
PUR/APF/2018-19/IND11686 |
supply and installation of Microplate Reader: Qty - 1 No. |
24.10.2018 @ 5.00pm |
M/s. Bioscreen Instruments Pvt. Ltd. |
PUR/APF/2018-19/IND11588 |
supply and installation of Nano Spectrophotometer: Qty - 2 Nos. |
24.10.2018 @ 5.00pm |
M/s. Labindia Analytical Instruments Pvt. Ltd. |
PUR/APF/2018-19/IND11786 |
supply and installation of Double Beam UV-VIS Spectrophotometer: Qty – 1 No. |
10.10.2018 @ 5.00pm |
Under process |
PUR/APF/2018-19/IND11785 |
supply and installation of Floor Model Incubator Shaker: Qty – 4Nos. |
10.10.2018 @ 5.00pm |
Under process |
PUR/APF/2018-19/IND11784 |
supply and installation of Refrigerated Table Top High Speed Centrifuge: Qty – 2 Nos. |
10.10.2018 @ 5.00pm |
Under process |
PUR/EQP/2018-19/IND11783 |
supply and installation of Bacterial Incubator: Qty – 2 Nos. |
10.10.2018 @ 5.00pm |
Under process |
PUR/APF/2018-19/IND11665 |
supply and installation of Gradient PCR Machine: Qty – 5 Nos. |
10.10.2018 @ 5.00pm |
M/s. Himedia Laboratories Pvt. Ltd. |
PUR/EQP/2018-19/IND11664 |
Supply and Installation of the -20°C Freezer: Qty – 4 Nos. |
10.10.2018 @ 5.00pm |
M/s. Dolche India |
PUR/EQP/2018-19/IND11661 |
supply and installation of Refrigerated Incubator: Qty – 2 Nos. |
10.10.2018 @ 5.00pm |
M/s. Ocean Life Science Corporation |
PUR/EQP/2017-18/IND11343 |
supply and installation of Autoclave (High Pressure Steam Sterilizer): Qty – 6 Nos. |
10.10.2018 @ 5.00pm |
M/s. Reliance Instruments Corporation |
CDFD/ENGG/HVAC/Works/ 2018-19/05 |
Providing of 2.0 TR Air Conditioners |
18.09.2018 @ 3.00pm |
Under process |
PUR/CHA/2018 |
Engagement of Clearing Agent for Customs Clearance of Imported Consignments at Hyderabad |
25.09.2018 @ 5.00pm |
Refloated - PUR/CHA/2019 |
CDFD/ENGG/SCRAP/Uppal/2018-19 |
Disposal of Un-serviceable / obsolete / scrap materials
| 26.09.2018 @ 11.00 AM |
Under process |
CDFD/ENGG/Elect/Works/2018-19/20 |
Supply and Laying of 2Rx3.5Cx400sq.mm. Aluminium Armoured Underground Cable from sub-station (LT panel) to BSL-3 Lab (LT panel) |
11.09.2018 @ 3.00pm |
Under process |
PUR/PRT/AR/2018-19/IND11855 |
printing and supply of ANNUAL REPORTS |
10.09.2018 @ 2.30pm |
M/s The Print House |
PUR/EQP/2018-19/IND11756 |
Supply and Installation Cold Cabinet |
16.08.2018 @ 6:00 PM< |
M/s. S.K. Cold Solutions |
PUR/APF/2018-19/IND11755 |
Supply and Installation ICE MACHINE (FLAKE / CHIP) |
16.08.2018 @ 6:00 PM |
M/s. BR Biochem Life Sciences Pvt. Ltd. |
CDFD/ENGG/Elect/Works/ 2018-19/18 |
Providing of chequered plates at UPS Rooms Indoor Cable Trenches Control Room (2x80kVA and 2x40kVA) at CDFD Laboratory Building, Uppal, Hyderabad |
27-07-2018 |
Under process |
PUR/COM/2017-18/IND11067 |
supply and installation of GPU Workstation |
02.08.2018 @ 6.00pm |
Under process |
PUR/APF/2017-18/IND11348 |
supply and installation of Refrigerated High Speed Floor Model Centrifuge |
02.08.2018 @ 6.00pm |
M/s. Thermo Electrom LED
Gmbh (M/s Thermo Fisher Scientific India Pvt. Ltd) |
PUR/EQP/2017-18/IND11346 |
supply and installation of Biological Safety Cabinet |
02.08.2018 @ 6.00pm |
M/s. Biolinx India Pvt. Ltd. |
PUR/EQP/2018-19/IND11873 |
supply and installation of DLP Projector |
02.08.2018 @ 6.00pm |
M/s. Electronic Service Point |
PUR/APF/2018-19/IND11782 |
supply and installation of Floor Model Refrigerated Incubator Shaker |
02.08.2018 @ 6.00pm |
M/s. Scigenics Biotech Pvt. Ltd. |
PUR/APF/2018-19/IND11800 |
supply and installation of CO2 Incubator (Water Jacketed) |
02.08.2018 @ 6.00pm |
M/s. Thermo Fisher Scientific (Hongkong) Limited (M/s. Genesis Biosolutions) |
PUR/APF/2018-19/IND11814 |
supply and installation of Gel-Documentation System |
02.08.2018 @ 6.00pm |
M/s. Eppendorf India Limited |
CDFD/ENGG/CIVIL/WORKS/2018-19/14 |
Lowering of Ground Level |
23.07.2018 @ 3.00 PM |
Under process |
PUR/FUR/2018-19/IND11815 |
supply of Executive High Back Revolving Chairs, Medium Back Revolving Chairs, and Stools with Cushion Top |
02.08.2018 @ 6.00pm |
M/s. Mansarover Industrial Corporation |
PUR/APF/2018-19/IND11811 |
supply and installation of Ultrasonic Bath Sonicator |
02.08.2018 @ 6.00pm |
M/s. Diagenode S.A. |
PUR/APF/2018-19/IND11766 |
supply and installation of Ultrasonic Probe Sonicator |
02.08.2018 @ 6.00pm |
M/s Sonic & Materials, Inc, (M/s inkarp Instruments Pvt. Ltd) |
PUR/APF/2017-18/IND11348 |
Refrigerated High Speed Floor Model Centrifuge |
02-08-2018 @6.00 PM |
Under process |
PUR/EQP/2018-19/IND11873 |
Supply and Installation of DLP LASER PROJECTOR |
02-08-2018 @6.00 PM |
Under process |
PUR/COM/2017-18/IND11067 |
Supply and Installation of GPU Workstation |
02.08.2018 @6.00 PM |
Under process |
PUR/EQP/2017-18/IND11346 |
Supply and Installation of BIOGICAL SAFETY CABINET |
02-08-2018 @6.00 PM |
Under process |
PUR/EQP/2017-18/IND11358 |
supply and installation of Vertical Laminar Air Flow Hood: Qty - 2Nos |
28.05.2018 @ 6.00pm |
M/s. Clasinair Systems |